Water Works 12 - Ground floor water tank float switch

Rectification of ground floor water tank over flow. There was no mechanism to stop the water from entering the tank when the tank is full. Our Tukang Paip was inform of the problem and the problem was solved by installing a new Copper Ball Float Valve in the tank to stop the water from over flowing.





This is how the copper Ball Float Valve looks like.

Saturday, November 25, 2006

Water Works 11 - ground floor pipe leaking

Rectification of water leakage at ground floor near office area.




Water leaks from cracks in cement floor. Tukang paip workers were informed of the problem. The workers broke the cement to isolate the faulty paip and replace the broken portion.











The broken PVC paip was removed.














New PVC paip was cut and joined.