The swampy area between Block A and Block B is cleared and filled with gravels. Soon this will make way for a access road to fire hydrant and rubbish/refuse collection room at WING-1.

Backhoe clearing the swampy land and filling with earth.

Gravel/rock/earth were filled and level..

Crusher-run were filled and leveled.

another view..