Some of the buyers listening to Rosman.
Hj Bakar taking notes.
More of the buyers listening to Rosman.
"CONDOMINIUM"
There still was some minor leakage. With the tank sealant that Simon gave me, i helped to seal the minor leakage. The payments for Simon's workers labour cost and the sealing materials was issued by persatuan.
Same here.. Simon's worker doing the sealing work.
The old Promista Office at Ground Floor had been turn into a Surau. Loud Speakers been installed by MC to please some people and irritate some people.
* More Revival works started since Aug07. The payment for new works come from Stakeholder Fund. Works done include the following
i).. fencing work between Block A and Block B... (DONE)
ii).. fencing work between Block A and Rumah Papans .. (DONE)
iii).. telephone cable ...(UNKNOWN STATUS)
iv).. paint works .. .(DONE - STOPPED)
v).. MotorBike Parking Shade.. (DONE - but still not enough).. update : 3 car park slots were converted into motorbike parking area without shade.
vi).. Drainage Cover.. (DONE).
vii).. landscape improvement .. in progress.
viii).. Childrend Playground.. (DONE).
ix).. Lift Bomba ok
x).. Even Floor Lift .. (DONE) ( Down again since last year)
Repair done by new management.
xi).. Odd FloorsLift ..(DONE)
xii).. Installing Fire Extinguisher. (DONE.. only at ground floor)
Installed back at all flour with breakglass box by new management.
xiii).. Repairing Bomba Tank and Hose reel Pipes. ( STATUS UNKNOWN.. actually work was not done at all).
xiv).. Water Tank.. 4 more roof top tanks waiting for repair. ( STATUS UNKNOWN.. not done at all)
xv).. Doors common area riser room doors ( DONE )
xvi).. Individual Letter Boxes been installed.. (DONE but not maintained, many boxed been damaged)