1) Water Tanks on Wing 1 and Wing 3 was cleaned by me... F.O.C
2) Tank on Wing 2 and the Centre Main Tank cleanned by Tukang Paip workers.
Roof Top Main Tank Overflows.
1) Informed Tukang paip about the posibility of overflow problem due to water level feedback design problem. Main Tank is split into 2, (Main Tank A and Main Tank B). Incoming water pours into both tanks but only Tank A have feedback sensors. The capacity of Tank A is much greater than Tank B due to the way the tanks were connected to each other. Main TANK A linked to tanks on WING1 and WING 3. Main TANK B is linked to WING2 tank only. So the water will overflow from Tank B until Tank A water sensor is activated.
We solve the problem by installing a Balancing Pipe between Tank A and Tank B.