INTRO

THESE SITE DOES NOT REPRESENT ESTANA COURT MANAGEMENT BUT MY PERSONAL RANTING AND SOME PICTURE TAKEN DURING THE ESTANA COURT REVIVAL PERIOD..

Sunday, September 30, 2007

Public Telephone

Looks like Sahfi/MC recently hv installed Public Phone at the ground floor Lift Lobby. Maybe the new AJK might hv requested for the public telephone.

Children enjoy playing with it. Let see how long it will last before getting vandalised.





Upswung Manual Barrier Gate got busted



The Manual Barrier Gate is broken... AGAIN ... 30-09-07

Its been only 2 months since MC installed the lever gate and its already broken twice.

Extremely dangerous to vichecles and people.








Was it knocked down or broken and fell like the first time??

Hope no one got hurt during the mishap.

Friday, September 28, 2007

Monday, September 24, 2007

Video upload 1st try - AGM4

Just got to know that blogspot.com had upgraded their features and now video clips can be posted.

This is my first try at posting video clip. The video clip was taken during the recent 4th AGM. Took the short video clip with my handphone camera.

Click the play button then wait for the video to load. Time taken to load the video depends on your internet speed. If your internet speed is slow then wait for the buffering to complete then play again. I am using maxis wireless broadband at estana court, at 9th floor the internet speed varies, sometime fast and sometimes slow.



If TS Jeffrey gives me a copy of the video that his "camera girl" took during the AGM then i will try to post that video here.

Wednesday, September 19, 2007

4th AGM

Annual General Meeting, AGM ke-4 was held at our dewan serbaguna on the 9Sept07.

Finally we had a AGM in a better looking Dewan than the previous years.








Speech from our chairman, Rosman.














Speech from our MC, Mr.Sahfi.














Saleem doing multitasking.. listening to Sahfi and reading news paper... hahaha














PPPEC members












Another view
















and another view














Makan time..















PPPEC members, freinds and family members having some refreshment.















Another view..











And another view
















And another view..











Finally after all the Q&A session, It was time for the old AJK to step down and a new AJK to take over. Most of the old AJK members had enough and refuse to be selected again (myself included).

Mj Mohd Ridzuan was selected to be our new chairman with Mj.Zaini, AJK Hj Aris, En.Hairani, etc as AJK. I am not sure who holds what post now.

Our ex-chairman, Rosman will be holding the advisor post to guide the new committee. He is volenteering to take over from Hj Lamang who is unfortunately, is still not well.

Hopefully, the new committee member names will be available soon.







Headache for Mj Zaini, Mj Zainal and Rosman.. for selecting new AJK. Many post are not filled on the 4th AGM but Rosman will arrange for some new member to hold certain important post.. like secretary, treasurer etc which are still vacant.

Childrens Play Ground

PPPEC and MC decided to build the children playground as per the requirement from MPAJ.

Early this month a Taman Permainan Kanak-Kanak was constructed at the empty space near the TNB rooms between Wing 1 and Wing 2. All this projects are controlled by our MC, if i am not mistaken this project was given to MPAJ, the cost for the construction was covered by the Stake Holder Money. Not cheap but still one of the low cost. Estimated to be over RM30K.






LEFT:Picture of the empty place around mid August2007.











RIGHT:Picture of the Children Playground around early September2007.

Thursday, August 16, 2007

Rest Place inside each WING

The rest place inside each WING was modified. In all 3 WINGs, permanent Tables and Chair are being build. Shafi's idea. He says plants willbe planted later at the corners.






Before













After.. incomplete.

Partition between Block A and the Rumah Papans


The old broken wire mesh wall between Block A and the rumah papans in front beside Jln Hj Mokhtar, is replaced with 5 feet high Metel Decks.

Partition Wall between Block A and Block B

The partition wall between Block A and Block B is in progress. A 8 feet high metal deck is being installed.





Sahfi insist on fixing a door to Block B for the indons and kampung pasir people who illegally occupy and cultivate some fish pond there.

A rumah papan had been turn into a Rela Post.










Another view..
















Again top view.. show the partition wall. This wall is temporary. The news is that when Block B is developed the wall must come down.

Drainage Cover

Most of the drainage are exposed. Sahfi want the drainage to be covered with concreate covers. So, the construction of the concrete covers is in progress..






Exposed drainage. Example of exposed drainage. Its everywhere.














Concrete covers with steel mesh inside is being mold.















Molding in process..










Same here.. more concrete cover being mold.

MotorBike Parking Shade

Presently we hv one temporary motorbike parking area below Wing3 near the Bilik Air and Bilik TNB. The area is insufficient as there are more Motorbikes than the shade can offer. Some tenents keep parking their motorbikes in the walkways to the Lift even when there is enough space at the parking area. Some tenents are just plain inconsiderate to others. We have decide to build a motorbike area near the entrace to estana court. The area takes about 8 car park place. Pic below.

Once complete, all motorbike must be parked under the shade provided. MC/security will lock any bikes parked in other areas.






top view
















another view.















ground level view.. still under construction.

Entrance View to Estana Court

Entrace to Estana Court. Some paint job been done.








Estana Court Logo at the entrace.
Wall painted.














Guard House was also painted.
Lever-Gate installed.

Tuesday, August 07, 2007

Telephone cable

As we all know, around the year 2005/6, some bloody animal had cut and stolen the telephone cables in the telephone riser rooms to all floor.

Last week the works for re-installing telephone cables to all floor had began.






installation of new telephone cable is in progress.








Works in telephone riser room at ground floor.

Paint Work

For the past 4 days, since 2August07, paint works at ground floor is in progress. Sahfi had decide to do two tone paint work at ground floor, but only ground floor will be painted. Walls, cable conduits and doors will be painted.

For the wall, a darker and lighter orange color was selected by him.





Note the newly installed notice boards. One for PPPEC and the other for MC-MIHRAB









First coat being painted..

Making passage/road between block A and B

The swampy area between Block A and Block B is cleared and filled with gravels. Soon this will make way for a access road to fire hydrant and rubbish/refuse collection room at WING-1.





Backhoe clearing the swampy land and filling with earth.










Gravel/rock/earth were filled and level..











Crusher-run were filled and leveled.









another view..

Lanscape

To the suprise of many, our Big Taiko had desided to cut trees which was part of the landscape, created by the defunct developer in accordance with MJAP requirement. Five big trees were cut, remaining 3 small trees. Sahfi says he got some plans for the area, he wants to plant some plants and make some sort of sitting shade. We shall see...






Gone








Gone


Clearing Drainage

According to Shafi, MPAJ had given verbal warning to clean up the drainage around estana court.

On the 10July07 backhoe was hired to clean-up the drainage.
















backhoe in action...



Lighting at main entrance




Before installing light at the entrace to estana court.. estana court logo not so visible.








After installing light at the logo.










Before installing light at the main entrace











street lights changed to brighter lights.