Water Works 14 - Water sub-meter readings 2

On 30-12-06, i got to know that Hj Bakar did not complete the water meter recording for Wing2 as aspected on the 20-10-06. 10days later he is telling me that he did not complete the task. What he had done was tagging only i.e recording of the unit numbers to the respective water meter pipes. He said Amir left him alone, so he couldn't do the meter readings.

Took the meter reading again for Wing2 with HjBakar. Recorded the serial numbers of the sub meter and the water reading.

Also re-recorded the sub water meter reading for the Wing 1 & 3 as well.

Sunday, December 24, 2006

Water Works 13 - Water sub meter readings

Last Tuesday(19-12-06) few buyers gathered to identify the water sub-meters and record down in a note book the sub-water meter reading along with the meter's serial number. These reading will be regarded as initial meter reading. Any additional reading will be charged at a rate which is yet to be set by Persatuan.


Those present for the job was myself(A-9-8),HjDollah(A-3-05, Rosman(A-4-01), HjAbu Bakar(A-12-6), ), Amir(A-6-05), HjRamlan and 2 more workers from BaktiSuci(SL-1,SL-2,SL-6,A-6-14&A-6-15), EnFaizal( ex-promista site supervisor).


Estana court Block A have 3 wings called Wing 1, Wing 2 and Wing 3. The Wing 1 faces Block B.


Recording of the sub meter in the water meter riser room for Wing 1 was done by myself and Hj Dollah.


Recording of the sub meter in the water meter riser room for Wing 2 was done by Hj Bakar and Amir (went back early)


Recording of the sub meter in the water meter riser room for Wing 3 was done by Hj Ramlan and En.Faizal.



Example of water sub-meter.

Electrical Works 10 - Lightning Arrestor

Installation of Lightning Arrestor Conductor Copper Strip was installed. This installation of copper strip is required by TNB in addtition to the alluminium based earthing strip installed earlier by Electrician Abu.




Abu and Yus preparing to install the copper strip from the Lightning Arrestor all the way down to ground floor. Watched by Simon at the roof top.


Copper strip.

Reaching Ground floor


Connecting the copper srtip to existing earthing strip( not stolen)

Thursday, December 21, 2006

Electrical Works 9

The collection of additional revival contribution was decided on 17 sept 06 during the AGM meeting. After 3months, only 58 buyers have made the payment. Electrician Abu will only install the missing/stolen cable to the units from the electrical RISER ROOM once payment is made to him.

3 months and only 58people hv responded. and people wonder why persatuan is moving so slow.

It would benefit the owners if they do their part and pay the agreed amount of RM2000.

Anyway, following are the name of buyers who have paid the additional reivval contribution of RM500 as agreed on the 17Sept06.

( UNIT NO / NAME / RECEIPT NO. / DATE )
-----------------------------------------------------------------------------------
A-9-09 / Arumugam a/l Thandauthapany / 19501 / 17-09-06 AJK
A-8-18 / Ting Tiah Seng (TS Jeffery) / 12075 / 17-09-06 AJK
A-3-05 / Zaiton bt Mhd Jani / contra / 17-09-06 contra food for AGM
A-7-16 / Zainal bin Mahfodz / 19504 / 23-09-06 AJK
A-G-SL3 / Ariffin b Ahmad / 19505 / 23-09-06 AJK
A-7-01 / Borsra b Ab Wahab / 19507 / 23-09-06 AJK
A-4-07 / Chong Choon Kong (Simon) / 19509 / 16-10-06 AJK
A-9-08 / Robert Kennedy Saysoo / 19510 / 16-10-06 AJK
A-4-17 / Mohamed Sahfi b Mohd Sadik / 19511 / 16-10-06 AJK- by invitation
A-5-16 / Muhammad Zairullah b Basiron / 19512 / 16-10-06 AJK
A- 2-01 / Zaileen Jalil / 19513 / 16-10-06
A-5-09 / Shamsul Kamal B Nizam Islah / 19514 / 16-10-06 AJK
A-4-05 / Dalbir Singh Gill / 19516 / 16-10-06
A-2-12A / Mejar Muhammad Zaini Mahmud / 19517 /16-10-06
A-4-11 / Fung Siew Mee / 19520 / 16-10-06
A-8-07 / Amir Hamzah / 19521 / 16-10-06
A-9-16 / Mohd Jainuri Yamo / 19522 / 05-11-06
A-11-05 / Rohaya Mohamed / 19524 / 05-11-06
A-7-07 / Ani & Aton Hashim / 19525 / 05-11-06 MrLion-AJK- by invitation
A-11-03 / Abdul Rahim bin Abdul Majid / 19526 / 05-11-06
A-9-14 / Mohd Sukri Husain / 19528 / 05-11-06
A-3-04 / Afridza by Komari / 19529 / 05-11-06
A-11-04 / Hashim bin Md Aris / 19530 / 05-11-06
A-12-03 / Zoal @ Zulkiflee / 19531 / 05-11-06
A-2-09 / Md Tahar bin Hj Ujang / 19532 / 05-11-06
A-9-11 / Mahathir Ahmad / 19533 / 05-11-06
A-5-10 / Anthony Das / 19534 / 05-11-06 AJK- by invitation
A-5-11 / Hafazah bt Hafidz / 19535 / 05-11-06 AJK
A-SL-1 / Bakti Suci ( Ramlan ) / 19536 / 08-11-06
A-SL-2 / Bakti Suci ( Ramlan ) / 19536 / 08-11-06

A-SL-6 / Bakti Suci ( Ramlan ) / 19536 / 08-11-06
A-6-14 / Bakti Suci ( Ramlan ) / 19536 / 08-11-06
A-6-15 / Bakti Suci ( Ramlan ) / 19536 / 08-11-06
A-6-12A / Chow Chee Keong ( Raymond ) / 19538 /08-11-06 AJK
A-4-08 / Noraini Ramli / 19539 / 13-11-06
A-2-16 / Saleem / 19540 / 13-11-06 AJK
A-2-17 / Saleem / 19540 / 13-11-06

A-G-03 / Md Aris Abu / 19541 / 13-11-06
A-10-11 / Ibrahim bin Mohamed / 19542 / 13-11-06
A-SL-4 / Ibrahim Taip / 19543 / 21-11-06
A-2-05 / Norazhar Mohamed / 19544 / 26-11-06
A-12-06 / Hj Abu Bakar / 19545 / 26-11-06
AJK- by invitation
A-1-08 / Hj Sufri b Hj Mhd Zin / 19547 / 26-11-06
A-4-01 / Rosman b Zainal @ Abdul Samad / 19548 / 06-12-06 AJK
A-9-17 / Rusida Zainal @ Abdul Samad / 19549 / 06-12-06
A-3-12 / Kamsiah / 19550 / 06-12-06
A-8-01 / Assunta Magret Rocky / 12176 / 06-12-06
A-1-02 / Nor Mas Hayati / 12177 / 10-12-06
A-4-16 / Ani Hitam / 12178 / 10-12-06
A-1-14 / Mohd Zahid Abdullah / 12179 / 10-12-06
A-4-12 / Rohaida bt Ismail / 12180 / 10-12-06
A-8-15 / Hanafie Mohd Imam / 12184 / 10-12-06
A-1-9 / Salmah bt Kechot / 12189 / 10-12-06
A-7-18 / Khairon Abd Ghani 12193 / 10-12-06
A-5-07 / Lee Sow Ying / 12194 / 10-12-06
A-5-15 / Mohd Soffi b Ismail / 12198 / 17-12-06
A-2-12 / Shihamul Fikri bin Abd Rahman / 12199 / 17-12-06

----------
UshraLite ~ Mohd Esa(A-11-02) - did not present for any meeting since elected as AJK during 17Sept06 AGM
Pintha( A-5-1) did not present for any meeting since elected as AJK during 17Sept06 AGM.

Friday, December 01, 2006

Ukay Bistari's Retaining Wall 4

The Ukay Bistari retention wall been repaired. The drainage been cleared.






BEFORE

Begining of October 2006












AFTER

End of November 2006