Electrical Works 10 - Lightning Arrestor
Installation of Lightning Arrestor Conductor Copper Strip was installed. This installation of copper strip is required by TNB in addtition to the alluminium based earthing strip installed earlier by Electrician Abu.
Abu and Yus preparing to install the copper strip from the Lightning Arrestor all the way down to ground floor. Watched by Simon at the roof top.
Abu and Yus preparing to install the copper strip from the Lightning Arrestor all the way down to ground floor. Watched by Simon at the roof top.