from bottom up, follow the photo numbers.
INTRO
THESE SITE DOES NOT REPRESENT ESTANA COURT MANAGEMENT BUT MY PERSONAL RANTING AND SOME PICTURE TAKEN DURING THE ESTANA COURT REVIVAL PERIOD..
Monday, September 25, 2006
Water Works09 - 22/09/06 Bulk Meter
The bulk water meter for the domestic and hydrant was installed on 22/09/06. The deposit for the meters was already paid. RM20900 for domestic meter and RM 1500 for hydrant meter.
from bottom up, follow the photo numbers.
from bottom up, follow the photo numbers.
14) Finally the meter is installed and the water flow is being tested. The water flow is confirmed ok.
13) The domestic water meters is being installed by Tukang Paip workers and watched by Mr.Zarkhan and Mr.Sahfi
12) Preparation for installing the domestic bulk meter is carried out by the Tukang Paip workers.
11) Seen here the Tukang Paip worker welding the modified pipe to fit the meter.Hydrant bulk meter in yellow color is installed. The blue color part is the water flow ON/OFF stop valve.
Water Works08 - 22/09/06 - Pre-Mix
The area where the Hot-Tapping was carried out was covered back and pre-mixed( tarmaced ). Some kampung fellas have threaten the Tukang Paip. If the area was not fixed back properly, they would damage the Tukang Paip lorry. How nice. If only they had looked after the Estana Court with such vigor. Afterall there are some people in the kampung who owns units in Estana Court too.
10) The dark tarmac is the area where the earth was excavated to do the Hot Tapping and installing the 7 meter lenght piping connecting the main water pipe to pre-installed piping to Estana Court.
9) The view shows the road leading to Estana Court. The square metal cover at the edge is the access cover to the water-stop-valve installed by Tukang Paip to ON/OFF the water flow to Estana Court.
Friday, September 22, 2006
Water Works07 - 22/09/06 - Hot Tapping
Hot-Tapping
One of the difficult works was completed today ( 22sept2006). That is Hot-Tapping the water from the main road, ulu kelang road to our condo. The kampung people gave some problem as the Hot-Tapping was done at the entrance of Jalan Haji Zam Zam. Persatuan had already send letter to the JKKK(Jabatan Keselamatan Kampung) informing them about the Hot-Tapping work. Yet the ignoramus and arrogant people wanted to cause trouble.
8) Tukang Paip workers cleaning the muds fron the road side where the Hot-Tapping was done.
7) Kampung guys checking on the works being done by Tukang Paip Johan Prosy Contractor.
6) Installing new pipe about 7 meter long . Tukang Paip zarkhan giving instruction to his workers.
5) Tukang Paip workers installing new pipe
4) Hot Tapping in progress
3) Searching for the uninstalled pipe between main pipe and the endcapped pipe done by promista piping contractor
2) Entrance to Estana from Main road where the Hot-Tapping is done
1) Safety sign boards were placed at the juction where the Hot Tapping is done.
One of the difficult works was completed today ( 22sept2006). That is Hot-Tapping the water from the main road, ulu kelang road to our condo. The kampung people gave some problem as the Hot-Tapping was done at the entrance of Jalan Haji Zam Zam. Persatuan had already send letter to the JKKK(Jabatan Keselamatan Kampung) informing them about the Hot-Tapping work. Yet the ignoramus and arrogant people wanted to cause trouble.
8) Tukang Paip workers cleaning the muds fron the road side where the Hot-Tapping was done.
7) Kampung guys checking on the works being done by Tukang Paip Johan Prosy Contractor.
6) Installing new pipe about 7 meter long . Tukang Paip zarkhan giving instruction to his workers.
5) Tukang Paip workers installing new pipe
4) Hot Tapping in progress
3) Searching for the uninstalled pipe between main pipe and the endcapped pipe done by promista piping contractor
2) Entrance to Estana from Main road where the Hot-Tapping is done
1) Safety sign boards were placed at the juction where the Hot Tapping is done.
Monday, September 18, 2006
Electrical Works 5
More pictures of the electrical cables to common area being repaired and replaced.
Another view of the remains of stolen cables at ground floor.
Sahfi assisting the electrician to install the cables.
New cables were installed in the Riser common area cable conduit.
Seen here, electrician Abu busy installing the cables
Another view of Abu fixing new cables in proper place.
Seen here, electrician installing cable from TNB room to Gen-Set room.
This picture shows the remains of missing/stolen common area cables exiting from Gen-Set room and TNB room.
Another view of the remains of stolen cables at ground floor.
Sahfi assisting the electrician to install the cables.
New cables were installed in the Riser common area cable conduit.
Seen here, electrician Abu busy installing the cables
Another view of Abu fixing new cables in proper place.
Seen here, electrician installing cable from TNB room to Gen-Set room.
Done. Finally the cable to common area is replaced. Soon electric from TNB to common areas will be activated.
Thursday, September 14, 2006
Electrical works 4 - TNB supply cable
This week the electrical cable wiring works from the TNB/MSB room is in progress. The common area cables from TNB/MSB room are missing/stolen. Presently the cables are being replaced.
This picture shows the electrical cable bus-bar in the RISER room. The 3-phase cables (0n the right side) connecting from RISER to RISER is still intact.
Another view of the cables in the RISER room. The dark-orange duct, holds the cables to the Bomba Lift (orange cables) and common area cables from the TNB room (black color - missing )
Electricians pulling heavy cables all the way up to the 12floor before installing into the RISER duct.
The cables are being installed.
Seen here, the electrician fixing the cables to the circuit breakers.
Friday, September 08, 2006
Electrical Works 3 - Missing TNB cables
The electrical wiring issue is not solved yet. When fund is enough then work will be done faster. So far electric wiring to common area lighting is solved.
Still left 2 more major areas.
1) The cables from TNB room to Passenger Lifts and some other areas.
2) Cables to individual units. This will require more fund.
This pic shows the cables from the TNB/Gen-Set room that was stolen long ago by some lowlife oppotunist.
This picture shows the cables to the Passenger Lift room at the rooftop had been stolen. Needs replacement.
This picture shows the cables were vandalized and stolen. It was done on every floor except for the ground floor. Need replacement need cash.
Friday, September 01, 2006
Roof Top
This picture was taken from the roof top. The Obstruction Light(red light lamp) post is still standing as well as the Lighting Arrester Rod and the TV antenna. The Obstruction Light is yet to be tested. The TV antena wiring need to be repaired. The Lighting Arrester Rod looks intact but the copper conductors that connects the Rod to ground had been stolen. This will cost few thousands of ringgit.
Subscribe to:
Posts (Atom)