INTRO

THESE SITE DOES NOT REPRESENT ESTANA COURT MANAGEMENT BUT MY PERSONAL RANTING AND SOME PICTURE TAKEN DURING THE ESTANA COURT REVIVAL PERIOD..

Monday, September 25, 2006

Water Works08 - 22/09/06 - Pre-Mix

The area where the Hot-Tapping was carried out was covered back and pre-mixed( tarmaced ). Some kampung fellas have threaten the Tukang Paip. If the area was not fixed back properly, they would damage the Tukang Paip lorry. How nice. If only they had looked after the Estana Court with such vigor. Afterall there are some people in the kampung who owns units in Estana Court too.




10) The dark tarmac is the area where the earth was excavated to do the Hot Tapping and installing the 7 meter lenght piping connecting the main water pipe to pre-installed piping to Estana Court.











9) The view shows the road leading to Estana Court. The square metal cover at the edge is the access cover to the water-stop-valve installed by Tukang Paip to ON/OFF the water flow to Estana Court.