Thursday, September 14, 2006

Electrical works 4 - TNB supply cable

This week the electrical cable wiring works from the TNB/MSB room is in progress. The common area cables from TNB/MSB room are missing/stolen. Presently the cables are being replaced.



This picture shows the electrical cable bus-bar in the RISER room. The 3-phase cables (0n the right side) connecting from RISER to RISER is still intact.








Another view of the cables in the RISER room. The dark-orange duct, holds the cables to the Bomba Lift (orange cables) and common area cables from the TNB room (black color - missing )







Electricians pulling heavy cables all the way up to the 12floor before installing into the RISER duct.












The cables are being installed.













Seen here, the electrician fixing the cables to the circuit breakers.