The electrical wiring issue is not solved yet. When fund is enough then work will be done faster. So far electric wiring to common area lighting is solved.
Still left 2 more major areas.
1) The cables from TNB room to Passenger Lifts and some other areas.
2) Cables to individual units. This will require more fund.



This picture shows the cables were vandalized and stolen. It was done on every floor except for the ground floor. Need replacement need cash.