Re-energizing the TNB supply is taking time as there are 3 separate departments from 3 different area are involve. Electrician Abu is doing the communication with all the 3 branches to re-energize electricity to the MSB room.
2. TNB Kepong : For meter panel, meter and fuse seal checking.
3. TNB Selayang: For energizing meter electric supply.
Now we are waiting for the TNB guys from Selayang to come and energize the electric meter. Our electric contractor, Abu is communicating with the TNB guys.
Kepong TNB guy are checking the meter panel.
Kepong TNB guys sealing the fuse, meter and the panel.