INTRO

THESE SITE DOES NOT REPRESENT ESTANA COURT MANAGEMENT BUT MY PERSONAL RANTING AND SOME PICTURE TAKEN DURING THE ESTANA COURT REVIVAL PERIOD..

Thursday, October 19, 2006

Electrical Works 8 - Re-Energizing MSB room

TNB power is in...

Monday 16/10/06, the TNB guys from Selayang Branch came but they were unable to re-energize the TNB room because the capacity of the power was too high for them to handle. As such, they contacted engineers from another brach to energize the MSB room.

Tuesday 17/10/06, 2 TNB engineers came and re-energised the electric supply to MSB room. Electrician Abu together with 2TNB contractor, checked the supply and activated the common area lighting.









The TNB electrical switch board.












Switch board being installed. All the switch board need servising because service due date was on 2000.











The re-energised common usage meter. The meter is station outside MSB room.