Now, the electric power supply to the Lift Bomba is coming from TNB sorce and not Get-Set. The Lift bomba is tuned to the new power sorce and it is in operating condition. The electric power supply is supplied to the Lift Bomba since 19/10/06. The Lift is test run daily, so far the Lift operation is stable.
The Lift repair guys have checked the PassengerLifts and will give a details of the damage after raya holidays.

Lift repair guys working under Ismail from dover, checking the Passenger Lifts electrical wiring.
Cost for repairing the Passenger Lifts will be known soon.