Temporary electric supply for the bomba lift will be supplied by the gen-set. The gen-set is serviced and is in running condition. The electrical cable to the bomba lift which was stolen was also replaced.
1) Electrical chargeman En.Abu checking and rectifying the electrical cables to the bomba lift in the MSB room.
2) Seen here, Abu checking the cables connections at the roof top Bomba Lift room.
3) The cables to the Bomba Lift at the roof top electrical switch board is restored. Power is supplied from the gen-set is checked. 3phase supply is confirmed to be at 415Volt.
4) Bomba Lift motor at roof top.
5) The picture shows the central control system panel. The control system was intact, no vandalism on the system. If it was stolen then it would have been very costly.
6) Lift maintenance people, En Ismail and En Abbas setting-up the bomba lift control panel. Seen here Abbas checking the control cards.