Saturday, August 12, 2006
Water Works3 - 07/08/06
Final Hydrant pipe pressure check before Syabas officer is called for inspection.
(15) - Hydrant pressure test at hydrant#1 with all 3 Hydrant connected together. Hydrant#2 is new along with its piping. Hydrant pressure test show 15psi. Pressure Test pass.
(14) - Tukang Paip worker fixing hydrant pressure gauge at hydrant #1
(13) - Tukang Paip workers draining water from the hole before works on the damaged Hydrant valve and the Hydrant is done.
(12) - Leaking hydrant (hydrant #3). Shows water quirting from the crack.
(15) - Hydrant pressure test at hydrant#1 with all 3 Hydrant connected together. Hydrant#2 is new along with its piping. Hydrant pressure test show 15psi. Pressure Test pass.
(14) - Tukang Paip worker fixing hydrant pressure gauge at hydrant #1
(13) - Tukang Paip workers draining water from the hole before works on the damaged Hydrant valve and the Hydrant is done.
(12) - Leaking hydrant (hydrant #3). Shows water quirting from the crack.