Next stage in the water issue is to check for any water leakage in the water tanks and internal piping. To do this we need water from syabas to fill up the 5 water tanks in the roof top. 3 tanks for consumer/domistic use and 2 tanks for bomba water tanks. Payments for the water was already made last month.

Based on the water tank measurement, the water quantity of 388.6m3 at the rate of 1.92 per m3 for the sum of RM746.11 was paid to syabas on the 4/7/06. This water will be pumped up to the roof top tank then leakage testing will be done.

To pump up the water, electricity is needed to supply current to the water pump motor. Generator(gen-set) in the Gen-Set room will be serviced and it will provide the electric to the water pump motor. Servicing of the get-set is in progress.

Hot tapping will be done by Tukang paip with Syabas's knowlendge. This involves the main pipe at the main road. I guess a portion of the road from the main road will be excavated.



This is the generator set in the gen-set room. A very high powered generator. This gen-set is being serviced and will be set up soon.