(11) - Found Pipe connecting Block A with Block B. The pipe connecting to Block B will be isolated by endcap.

(10) - Excavating land seaching for Pipe connecting Block A with Block B.

(9) - Tukang Paip man at work in rain.

(8) - Tukang Paip giving instruction to his workers.

(7) - Pressure check for hydrant piping from meter inlet to hydrant#1. Pressure gauge shows full pressure 250psi.

(6) - “Tukang Paip” workers pumping water into hydrant pipe and checking the water pressure in the hydrant pipe. Pressure test fails as water is leaking somewhere in the hydrant piping.